I-40 bridge over the mighty Mississippi would be a main route for transporting oil, petrol, food, etc. across the river by truck. With the pipeline not running and all the other sh*t going on - this - suddenly hitting the fan also has my false flag and/or sabotage meter swung off the scale.
Seems to me that the break could be temporarily patched with some mondo strong thick steel sheets welded and bolted across that break. Bridge could be operational in a week or two while plans for a permanent repair were worked out, one would think. But then, what do I know? All I have is a brain full of good old fashion LOGIC to draw on in the playground in my head.
~~~~~~~~~~~~~~~~~~~
This below from a local Memphis source.
https://dailymemphian.com/article/21880/i-40-mississippi-river-bridge-could-be-closed-months#/questions
Screenshot of the article follows below. Easy to read if enlarged. Note barge traffic under the bridge is also stopped. (bottom of article)
THAT IS A BIG DEAL!!! Jim Stone comments below. I disagree with the "nothing wrong with the bride" part but I do agree with the “subversion” and the "nothing wrong with the pipeline" parts. Too many pieces are lining up all at once to ignore peeps.
Sabotage ? ? ? or coincidence ? ? ? Has my tin foil hat tingling.
!! FOXTROT JULIET BRAVO !!